Home NCU English

這個頁面上的內容需要較新版本的 Adobe Flash Player。

取得 Adobe Flash Player

您現在的位置:首頁 > 師資介紹 > 陳振明 教授 兼
師資介紹
陳振明 教授 兼
最高學歷: 美國賓州州立大學工管博士
專長領域: 人工智慧、物流系統、製造系統
研 究 室: I1-718 / 分機 66553
Office hour: 一 10:00~14:00
電子信箱: jmchen@mgt.ncu.edu.tw

期刊論文

  1. Nguyen, T.M.H. and J.M. Chen* (2023), Pricing strategy in remanufacturing using a spatial model approach, Journal of Industrial and Production Engineering.
  2. Nguyen, T.M.H. and J.M. Chen* (2022), Pricing and investment strategy on digital technology in a supply chain, International Journal of Industrial Engineering: Theory-Applications, and Practice.
  3. Reong, S., J.M. Chen, J.C.P. Yu, Y.L. Hsiao, and H.M. Wee  (2022), Optimal inbound/outbound pricing model for re-manufacturing in a closed-loop supply chain, International Journal of Industrial Engineering-Theory,Applications, and Practice.
  4. Nguyen, T.M.H., J.M. Chen, V.H. Nguyen  (2022), Pricing strategy and order quantity allocation with price-sensitive demand in three-echelon supply chain,  Expert Systems with Applications.
  5. Chang, C.H. and J.M. Chen*  (2022), Capacity policy for an OEM under production ramp-up and demand diffusion, Mathematical Problems in Engineering.
  6. 陳振明* (2021), 台灣觀光旅館業之現況分析與收益管理初探 (A Preliminary Study of Status Analysis and Revenue -Management  in Taiwan’s Tourist Hotel Industry), 產業與管理論壇 (Industrial & Management Forum).
  7. Chen, J.M.* and C.Y. Chi  (2019), Reverse channel choice in a closed-loop supply chain with new and differentiated remanufactured goods, Journal of Industrial and Production Engineering.
  8. Chen, J.M. and Chia-I Chang  (2013), Dynamic pricing for new and remanufactured products in a closed-loop supply chain, International Journal of Production Economics.
  9. Chen, J.M. and C.I. Chang (2012), The co-opetitive strategy of a closed-loop supply chain with remanufacturing, Transportation Research Part E: 
    Logistics and Transportation Review, Vol. 48, No. 2 (March), 387-400..
  10. Chen, J.M. and H.L. Cheng  (2012), Effect of the price-dependent revenue-sharing mechanism in a decentralized supply chain,  Central European Journal of Operations Research, Vol. 20,
    Issue 2 (April), 299-317..
  11. Chen, J.M. and T.H. Chen (2012), Response to "Note on , Journal of the Operational Research Society, Vol. 63, No. 5 (May), 697–698. .
  12. Chen, J.M. and C.I. Chang (2012), The economics of a closed-loop supply chain with remanufacturing, Journal of the Operational Research Society, Vol. 63, No. 10 (October),
    1323-1335..
  13. 陳振明、谷春芸 (2012), 面對網路商店進入下雙通路競爭之定價策略, 電子商務學報 (Journal of E-Business).
  14. Chen, J.M. and C.I. Chang (2012), The economics of hybrid manufacturing systems in a closed-loop supply chain, NETNOMICS: Economic Research and Electronic Networking,
    (SCOPUS, INSPEC, EconLit, 
    accepted on 20 November 2012).
  15. Chen, J.M. and C.I. Chang (2012), Pricing strategies for managing new and remanufactured products
    in a closed-loop supply chain, INFORMATION-An International Interdisciplinary Journal,
    (SCI, accepted on 14 November 2012).
  16. Chen, L.T., J.M. Chen, and Ben Wang (2011), Pricing and order-up-to decisions for a perishable item with price and stock-dependent demand under LIFO policy, International Journal of Information and Management Sciences,
    Vol. 22, No. 4 (December).
  17. Chen, J.M., H.L. Cheng, and I.C. Lin (2011), On channel coordination under price-dependent revenue-sharing: Can eBay’s fee structure coordinate the channel?, Journal of the Operational Research Society, Vol. 62,
    No. 11 (November), 1992–2001. .
  18. Chen, J.M., H.L. Cheng, and M.C. Chien (2011), On channel coordination through revenue-sharing contracts with price and shelf-space dependent demand, Applied Mathematical Modelling, Vol. 35, Issue 10 (October), 4886–4901..
  19. Chen, J.M., H.L. Cheng, and M.C. Chien (2011), Equilibrium analysis and Pareto improvement of a supply chain under
    revenue sharing contract 
    with consignment and slotting allowances, African Journal of Business Management, Vol. 5,
    No. 22 (September), 8763-8777..
  20. Lin, Y.H., J.M. Chen, and Y.C. Chen (2011), The impact of inspection errors, imperfect
     maintenance and minimal repairs on an imperfect production system, Mathematical and Computer Modelling, Vol. 53, Issue 9-10 (May), 1680–1691..
  21. Chen, J.M.,L.T. Shi, S.A. Hu, and Y.H. Lin (2011), Modeling and analysis of eBay.com’s fee structure: a
    newsvendor approach, International Journal of Information, Business and Management,
    Vol. 3, No.1 (May), 137-144..
  22. Chen, J.M., Y.H. Lin, and Y.C. Chen (2010), Economic optimization for an imperfect production system with
    rework and scrap rate, International Journal of Industrial and Systems Engineering, Vol. 6,
    No. 1, 92-109. (EI, Engineering Village – Compendex).
  23. Lin, Y.H., J.M. Chen, and T.C. Chiang (2010), Channel coordination for a newsvendor problem with return and
    quantity discount, Journal of Information and Optimization Sciences,
    (INSPEC, Accepted on 23 June 2009).
  24. Chen, J.M., I.C. Lin, and H.L. Cheng (2010), Channel coordination under consignment and vendor managed
    inventory in a distribution 
    system, Transportation Research Part E: Logistics and Transportation Review,
    (SSCI, Accepted on 28 April 2010).
  25. Chen, J.M., H.L. Cheng, and M.C. Chien (2010), On eBay’s fee structure from a channel coordination perspective, Industrial Engineering & Management Systems: An Official Journal
    of APIEMS & KIIE, Vol. 9, (INSPEC, ISSN: 1598-7248, Accepted on 17 May 2010).
  26. Chen, J.M. and T.T. Cheng (2010), Optimal six-sigma level in TFT-LCD manufacturing: a case study, International Journal of Information, Business and Management,
    Vol. 2, No. 2 (October), 16-20. (Ulrich.
  27. Chen, J.M. and I.C. Lin (2010), Ordering and pricing policies under vendor managed inventory and
    consignment arrangements, International Journal of Information and Management Sciences,
    Vol. 21, No. 4 (December),
     453-468. (EI’s Engineering Village–Compendex, TSSCI).
  28. Wang, P.C., Y.H. Lin, Y.C. Chen, and J.M. Chen (2009), An optimal production lot-sizing problem for an imperfect process with imperfect maintenance
    and inspection time length, International Journal of Systems Science  Vol. 40, No. 10, 1051-1061. (SCI).
  29. Chen, J.M. and T.H. Chen (2008), Reply to Comment on Optimizing supply chain collaboration based on joint replenishment and channel coordination, Transportation Research Part E: Logistics and Transportation Review, Vol. 44, No. 5, 950-953.
  30. Chen, J.M., H.L. Cheng, M.C. Chien (2008), Profit maximization models for a manufacturer-retailer channel under consignment and revenue sharing contract, Journal of the Chinese Institute of Industrial Engineers (工業工程學刊), Vol. 25, No. 5, 413-422.
  31. Chen, L.T. and J.M. Chen (2008), Collaborative marketing and production planning with IFS and FSI production systems, Journal of the Chinese Institute of Industrial Engineers (工業工程學刊), Vol. 25, No. 4, 337-346.
  32. Chou, C.M. and J.M. Chen (2008), A design of exit mechanism for information system project de-escalation, Information Technology Journal, Vol. 7, No. 1, 137-142.
  33. Chen, J.M., Y. S. Chen, and M. C. Chien (2008), Optimal lot-sizing and pricing with markdown for a newsvendor problem, Industrial Engineering & Management Systems: An Official Journal of APIEMS & KIIE, Vol. 7, No. 3 (December), 257-265. (ISSN: 1598-7248).
  34. Chen, L.T. and J.M. Chen (2008), Optimal pricing and replenishment schedule for deteriorating items over a finite planning horizon, International Journal of Revenue Management, Vol. 2, No. 3, 215-233. (ISSN 1474-7332 or Online 1741-8186).
  35. Chen, J.M., Y. S. Chen, and M. C. Chien (2008), Optimal lot-sizing and pricing with markdown for a newsvendor problem, Industrial Engineering & Management Systems: An Official Journal of APIEMS & KIIE, Vol. 7, No. 3 (December), 257-265. (ISSN: 1598-7248).
  36. Chen, J.M. and T.H. Chen (2008), Reply to "Comment on , Transportation Research Part E: Logistics and
     Transportation Review, Vol. 44, No. 5, 950-953. (SSCI).
  37. Chen, L.T. and J.M. Chen (2008), Optimal pricing and replenishment schedule for deteriorating items over a finite planning horizon, International Journal of Revenue Management, Vol. 2, No. 3, 215-233. (ISSN 1474-7332 or Online 1741-8186).
  38. Chou, C.M. and J.M. Chen (2007), Facilitating new product development with collaborative e-commerce system: an investigation in semiconductor industry, Journal of Information Management (資訊管理學報), Vol. 14, 139-162.
  39. Chen, J.M. and T.H. Chen (2007), The profit maximization model for a multi-item distribution channel, Transportation Research Part E: Logistics and Transportation Review, Vol. 43, No. 4, July, 338-354.
  40. Chen, J.M. and L.T. Chen (2007), Periodic pricing and replenishment policy for continuously decaying inventory with multivariate demand, Applied Mathematical Modelling, Vol. 31, 1819-1828.
  41. Yu, J., H.M. Wee, J.M. Chen, and F.R. Kuo (2007), Solving four-echelon integrated inventory model using a heuristic approach, Journal of Information and Optimization Sciences, Vol. 28, No. 1, 17-32.
  42. Chou, C.M. and J.M. Chen (2007), Facilitating new product development with collaborative e-commerce system: an investigation in semiconductor industry, Journal of Information Management (資訊管理學報), Vol. 14, 139-162.
  43. Chen, J.M. and T.H. Chen (2007), The profit maximization model for a multi-item distribution channel, Transportation Research Part E: Logistics and Transportation Review, Vol. 43, No. 4, July, 338-354.
  44. Chen, J.M. and L.T. Chen (2007), Periodic pricing and replenishment policy for continuously decaying inventory with multivariate demand, Applied Mathematical Modelling, Vol. 31, 1819-1828.
  45. Yu, J., H.M. Wee, J.M. Chen, and F.R. Kuo (2007), Solving four-echelon integrated inventory model using a heuristic approach, Journal of Information and Optimization Sciences, Vol. 28, No. 1, 17-32.
  46. Chen, Y.L, J.M. Chen, and C.W. Tung (2006), A data-mining approach for retail knowledge discovery with consideration
    of the effect of shelf-space adjacency on sales, Decision Support Systems, Vol. 42, 1503–1520. (SCI).
  47. Chen, T.H. and J.M. Chen (2006), Optimal pricing and replenishment policy for a deteriorating item
    in a two-echelon supply chain, Journal of Statistics & Management Systems, Vol. 9, No. 2, 285-299. (EI’s Engineering Village 2 - EV2, INSPEC).
  48. Chen, J.M., L.T. Chen, and J.D. Leu (2006), Developing optimization models for cross-functional decision-making: integrating marketing and production planning, OR Spectrum Vol. 28, No. 2, 223-240. (SCI, Impact Factor 1.224 in 2006, ranking 9th among 60
    journals in OR&MS category).
  49. Chen, J.M. and L.T. Chen (2006), Market-driven production lot-size and scheduling with finite capacity for a deteriorating item, Production Planning & Control, Vol. 17, No. 1, 44-53. (SCI).
  50. Chen, J.M. and T.H. Chen (2005), Effects of joint replenishment and channel coordination for managing
    multiple deteriorating
     products in a supply chain, Journal of the Operational Research Society, Vol. 56, No. 10, 1224-1234. (SSCI, Impact Factor 0.597).
  51. Tsou, J.C. and J.M. Chen (2005), Case study: quality improvement model in a car seat assembly line, Production Planning & Control, Vol. 16, No. 7, 681–690. (SCI).
  52. Tsou, J.C. and J.M. Chen (2005), Dynamic model for a defective production system with Poka-Yoke, Journal of the Operational Research Society, Vol. 56, 799-803. (SSCI).
  53. Chen, J.M. and T.H. Chen (2005), The multi-item replenishment problem in a two-echelon supply chain: The effect of centralization
    versus decentralization, Computers & Operations Research, Vol. 32, No. 12, 3191-3207. (SCI).
  54. Chen, J.M. and L.T. Chen (2005), Pricing and production lot-size/scheduling with finite capacity for a deteriorating item over
    a finite horizon, Computers & Operations Research, Vol. 32, No. 11, 2801-2819. (SCI).
  55. Yu, C.P., H.M. Wee, and J.M. Chen (2005), Optimal ordering policy for a deteriorating item with imperfect
    quality and partial backordering, Journal of the Chinese Institute of Industrial Engineers (工業工程學刊), Vol. 22, No. 6, 509-520. (EI).
  56. Tsou, J.C. and J.M. Chen (2005), The relation between cost and yield rate in a JIT production system, International Journal of Information and Management Sciences,
    Vol. 16, No. 1, 83-92. (EI).