Home NCU English

這個頁面上的內容需要較新版本的 Adobe Flash Player。

取得 Adobe Flash Player

您現在的位置:首頁 > 師資介紹 > 兼
師資介紹
最高學歷:
專長領域:
研 究 室: / 分機
Office hour:
電子信箱:

期刊論文

  1. Liao, C. N. and Kao, H. P. (2014), An evaluation approach to logistics service using fuzzy theory, quality
    function development and goal programming, Computers & Industrial Engineering, Volume 68, February 2014,
    Pages 54–64  .
  2. Liao, C. N. and Kao, H. P. (2011), An integrated fuzzy TOPSIS and MCGP approach to 
    supplier selection in supply chain management, Expert Systems with Applications, Volume 38, Issue 9. .
  3. Liao, C. N. and Kao, H. P. (2010), A hybrid channel Stackelberg game under transaction cost analysis, International Journal of Information 
    and Management Sciences, Vol. 21, No. 3, September 2010,
    Pages: 343-363.
  4. Liao, C. N. and Kao, H. P. (2010), Supplier selection model using Taguchi loss function, analytical
    hierarchy process and multi-choice goal programming, Computers and Industrial Engineering.
  5. H. F. Hung, H. P. Kao, Y. S. Juang (2008), An integrated information system for product design planning, Expert Systems With Applications, Vol. 35,  Issue 1-2, Pages 338-349.
  6. H. F. Hung, H. P. Kao, Y. Y. Chu (2008), An empirical study on knowledge integration, technology innovation
    and experimental practice, Expert Systems With Applications, Vol. 35, Issue 1-2, Pages 177-186.
  7. K. C. Ku, A. Wensley, H. P. Kao (2008), Ontology based knowledge management for joint venture projects, Expert Systems With Applications, Vol. 35, Issue 1-2, Pages 187-197.
  8. Y. S. Juang, S. S. Lin, H. P. Kao, Y. L. Cheng (2007), An Integrated Approach to Collaborative Supply Chain Design, International Journal of Business and Information, accepted,
    April2007.
  9. Y. S. Juang, S. S. Lin, H. P. Kao, Y. L. Cheng (2007), An Integrated Approach to Collaborative Supply Chain Design, International Journal of Business and Information, Vol. 2, No 1.
  10. K. C. Ku, H. P. Kao, C.-K. Gurumurthy (2007), Virtual inter-firm collaborative framework-an IC foundry
    merger/acquisition project, Technovation 27, 2007, pp. 388-401.
  11. Y. S. Juang, S. S. Lin, H. P. Kao (2007), A knowledge management system for series-parallel availability
    optimization and design, Expert Systems with Applications, Vol. 34(1), pp. 181-193.
  12. Y. S. Juang, S. S. Lin, H. P. Kao (2007), Adaptive scheduling system with genetic algorithms for arranging
    employee training programs, International Journal of Expert Systems with Applications, Vol. 33 (3),
    pp. 642-651.
  13. Y. S. Juang, S. S. Lin, H. P. Kao (2007), Design and implementation of a fuzzy inference system for supporting
    customer requirements, International Journal of Expert Systems with Applications, to appear
    in Vol. 32 (3), pp. 868-878.
  14. K. C. Ku, H. P. Kao, C.-K. Gurumurthy (2007), A collaborative model for capacity expansion of the IC
    foundry industry, International Journal of Advanced Manufacturing Technology,
    Vol. 34(3), pp. 256-261.
  15. K. C. Ku, C.-K. Gurumurthy, H. P. Kao (2007), Inter-firms collaboration of joint venture in IC foundry business, Technovation, Vol. 27, No. 5, 2007, pp. 296-305.
  16. K. C. Ku, H. P. Kao (2006),
    Virtual inter-firm collaborative framework– the case of an IC foundry
    joint venture project, Journal of the Chinese Institute of Industrial Engineers (Special
    Issue on Project Management for Manufacturing and High-Tech
    Operations).
  17. H. P. Kao (2006),
    Design for logistics in set-based concurrent engineering environment, Journal of the Chinese Institute of Industrial Engineers Vol. 23,
    No. 1, 34-47.
  18. H. P. Kao, B. Wang, J. Dong, K. C. Ku (2006),
    An event-driven approach with makespan/cost tradeoff analysis for
    project portfolio scheduling, International Journal of Computers in Industry, Volume 57 (5),
    379 - 397.
  19. H. F. Hung, H. P. Kao, K. C. Ku (2006),
    Evaluation of design alternatives in collaborative development and
    production of modular products, International Journal of Advanced Manufacturing Technology,
    Published (online first).
  20. Y. S. Juang, S. S. Lin, H. P. Kao (2006),
    An integrated information system for customer requirement analysis, International Journal of Applied Management and Technology.
  21. H. P. Kao, B. Hsieh, Y. C. Yeh (2006),
    Petri-net based approach for scheduling and rescheduling resource-constrained multiple projects, Journal of the Chinese Institute of Industrial Engineers.
  22. B. Wang, H. P. Kao, J. Huang (2004),
    process-oriented methodology for designing the logistics service
    provider, International Journal of Electronic Business Management, Vol. 2 (4),
    201-209.
  23. J. C. Tsou, H. P. Kao (2003), The Implementation of E-Commerce Ontology, International Journal of the Computer.
  24. H. P. Kao, E. Su, B. Wang (2002), I2QFD: A blackboard-based multiagent system for supporting
    concurrent engineering project, International Journal of Production Research.
  25. L. K. Chan, H. P. Kao, A. Ng, M. L. Wu (1999), Rating the importance of customer needs in quality function
    deployment by fuzzy and entropy methods, International Journal of Production Research.
  26. 高信培,張裕庭, 李允中 (1994),
    優化佈設FMS 的模糊型專家系統, Journal of the Chinese Fuzzy Systems Association.